Menu

PDF version

Technical Data Sheet (TDS)

CCR-630 Quikote

Water Based Epoxy Coating

Special features

  • Economic coat for warehouse flooring
  • Can be tinted (except in light colors) and/or flaked
  • Provides a dust-free and easy clean surface

Pre-Installation Checklist
A successful installation requires proper preparation of the subfloor. Read and understand all applicable guidelines and Technical Data Sheets before installation.
Sub Floor Examination
Prior to installation, the subfloor must be checked according to applicable installation guidelines. It must be solid, sound, clean, porous, free of chaps, anti-adherents, and resistant to pressure and tension. Confirm sufficient porosity by performing a water drop test according to ASTM F3191-16. Check for missing or compromised vapor barriers and hydrostatic pressure by carrying out RH or CaCl moisture tests following ASTM standards F1869-16 or F2170-19. Results of 99% RH or 25# CaCl could indicate a higher moisture content in the slab than what tests can measure, and there might be hydrostatic pressure and/or a compromised or missing vapor barrier.
Sub Floor Preparation
The subfloor's condition will determine which type of mechanical treatment is required (e.g., wire brushing, sanding, grinding, or shot blasting). Dust, paint, curing compounds, sealers, residual adhesives, or other surface contaminants MUST be removed, and a porous surface must be achieved by suitable means. The installer can only determine the extent of subfloor preparation at the site. Clean the surface with an industrial vacuum cleaner and tack the floor with a damp microfiber mop before application. Do not use sweeping compounds unless water-based, as most others contain oil or wax, which will act as an anti-adherent and prevent primers, sealers, leveling compounds, coatings, and/or adhesives from bonding to the concrete. Cracks and gaps must be treated before application of primers, sealers, leveling compounds, coatings, and/or adhesives (see Technical Information #19 @ www.staufusa.com).
Mixing of Components
The lid contains a hardener. Pierce all the way through the plastic disc in the center of the lid and the bottom of the lid using a long screwdriver or similar tool. Let the hardener flow into the lower part of the bucket for one minute. All of the hardener must drain into the pail before mixing Parts A&B. Open the ring, remove the lid, and mix both components with a mixing paddle for at least 3 minutes. Use an electric drill with less than 300 rpm until an even color is reached. Avoid air entrapment by mixing slowly and using an appropriate mixing paddle. Make sure to mix along the wall and bottom of the container as well. The temperature of both components should be at least 50°F before mixing.
Installation Procedure
Mix pail according to mixing instructions. Apply coating undiluted with an approved applicator. Make sure the coating is spread evenly and up to the perimeters. The spread rate is critical for a successful installation. Do not exceed the minimum or maximum coverage.
Storage
Store and transport protected from freezing. Recommended minimum temperatures are 35°F for transport and 40°F for storage. Do not stir the product if frozen, allow it to thaw completely.
Limitations
When using other than STAUF products in conjunction with STAUF primers, sealers, leveling compounds, or adhesives, STAUF denies any and all responsibility for any ensuing problems and/or damages without prior written authorization from STAUF.
Do not dilute primer/sealer or mix with other products.
The foregoing representations are based on the results of our most current product and material testing within a controlled environment and are of a non-obligatory advisory nature only. As such, they do not constitute an express or implied warranty of any kind including the Warranty of Merchantability and/or Fitness for a Particular Purpose. Because we have no control over the actual quality of workmanship, materials used, and worksite conditions, STAUF USA LLC will in no event be liable for any incidental and/or consequential damages. Therefore, we strongly recommend that prior on-site testing be conducted to refer to and study the suitability of the product for the intended purpose. With the release of this Technical Information Sheet, all its prior versions become invalid. For warranty and warranty disclaimer information please see our Limited Lifetime Warranty @ www.staufusa.com
General Features
  • Contains no chlorinated solvents
  • Contains no solvents
  • Contains no VOC (calc. per CA Rule 1168)
  • Ozone friendly
  • Not freeze/thaw stable
  • Contains no isocyanates
Installation Features
  • Very low odor
  • High spread rate
  • Excellent penetration of subfloor
  • Dries quickly
  • Higher temp will shorten drying time
  • Observe pot life during installation
Long Term Features
  • Resistant against aging
Viscosity [cps]
  • A:800-1200 B:600-900 Mix:800
Approved Subfloors
  • Concrete Slabs
  • Cured Leveling Compounds
  • Radiant Heated Subfloors
  • Drywall
  • Plaster
Approved Trowels and Spread Rate
  • 3/8 in. Nap Roller: up to 200 SF/gal (8 mil)
Drying Time
  • Approx. 2 hours or until clear
Temperature Range during Installation
  • 50-90F (10-32C)
Relative Humidity Range during Installation
  • 30% - 80%
Packing Size
  • 2.5 gal. Metal Combo Pail (A+B)
Density [lbs./gal.]
  • Mix: 13.6
Color
  • White
Color Hardener
  • Clear
Mixing Ratio
  • 1 part A + 5 part B by weight
  • 1 Part A + 3.3 Parts B by volume
Pot Life
  • Approx. 45 min. @ 70F (21C)
pH value of concrete
  • Resistant up to 14
Storage
  • Above 32F, not freeze/thaw stable
Shelf Life
  • 24 Months in original, unopened container
Transportation
  • UN 3082 ENVIRONMENTALLY HAZARDOUS SUBSTANCE, LIQUID, N.O.S. (Epoxide resin), 9, III
Revision: 2022-05-24 16:14:50

Please enter the email address of the person to whom you would like to send this PDF.